1. Board of Trustees

  2. Discussion

    1. Pat Roley

      I wanted to let you know that after cleaning up fro...

    2. Shawna Mercredi

      one of the chairs in the Library needs a crack to b...

    3. Shawna Mercredi

      The hardware for the pole banners have arrived. Pl...

  3. Events

  4. Members

    1. Bobo (ALCS) Bobo (ALCS)
    2. Dan Bushmeyer Dan Bushmeyer
    3. George Hargrave George Hargrave
    4. Ross Heimbigner Ross Heimbigner
    14 more...

Board of Trustees

Discussion

Pat Roley

I wanted to let you know that after cleaning up from the party on Sunday in the kitchen there was a swarm of ants once again on the floor by the door into the kitchen. I mopped up the ants with water and put out new ant bate that was under the kitchen sink. I suggest that the exterior of the building be sprayed for ants. I have experienced this problem in a portion of my home with concrete foundation and ants can build nests in the walls and it becomes an ongoing problem until you have the foundation on the outside sprayed. Once I had Aptive come out for a year the problem did not reoccur. This problem is getting worse not better.

I also purchased black 33GA garbage bags for the kitchen as we were completely out. I put the box purchased in the kitchen under the sink, but you may want to check the supply for the church as we could not find any bags in the storage closet.

Thank you for all you do!

Shawna Mercredi

one of the chairs in the Library needs a crack to be glued. It has a note on int. if you don't want to do that then it can be discarded. a replacement will not be ordered.

Julia Sinclair

Hi Trustees, A donor has come forward offering to replace the chair in question along with purchasing another to have on hand should we need it. Contact me and I will put you in touch with the donor. Hope this news helps take some stress off your plate to have to source and purchase a replacement yourself.

Julia Sinclair

Hi Trustees, A donor has come forward offering to replace the chair in question along with purchasing another to have on hand should we need it. Contact me and I will put you in touch with the donor. Hope this news helps take some stress off your plate to have to source and purchase a replacement yourself.

Shawna Mercredi

The hardware for the pole banners have arrived. Please let me know when someone can install them. Ultimately, evangeilism would like them installed in time for lent. You can text or email me, Shawna Mercredi, to discuss logistics. 206-949-4483, smercredi@live,com.

Shawna Mercredi

Lent starts in 2 weeks. It would be great to have these installed by then. Please contact me to arrange a time.

Shawna Mercredi

One of the toilets in the ladies room in the church building still has a slow leak. it runs to top off the tank every few mins.

Paix Irigon

Hello,
I was in the LSC today and the toilet in the men's bathroom is still not retaining the water properly to flush. I turned off the water for now. Thank you!

George Price

I installed a new rubber seal, and the toilet is now retaining water in the water reservoir. 9-2

Julia Sinclair

The handicap stall in the LSC ladies room needs to be fixed- possibly a defective seal in the tank? The water was running constantly so it was turned off. Out of order sign posted on that stall.

David Allison

The gasket on the stopper was rolled / folded over for about 30 to 40 deg. of the circumference. I re-stretched and seated the gasket and it is sealing for now. I left the water supply turned on and removed the "Out of Order" sign. We'll want to monitor and replace/rebuild if the gasket rolls again.

David Allison

I'll try and swing by tonight after work and see if it is just a float / chain adjustment issue or what style stopper rebuild kit is needed.

Shawna Mercredi

The women's bathroom vent fan is squealing. it's like fingernails down a chalkboard.it just started today.

George Price

I checked it out today and no squealing noise. I'll take another look tomorrow.

Shawna Mercredi

Hello trustees, I have a bulletin board that needs to be installed in the resource room. Also, in the resource room, the heater still needs to be replaced as well as the blinds to match the ones in the library and family room.

Let me know if you need any clarification.

George Price

I will hang the bulletin board tomorrow and check out the heater.

Shawna Mercredi

I have marked with tape where the bulletin board goes in the Resource room it is ready for someone to install.

Shawna Mercredi

George, back in December I posted that the heater thermostat is not working. Dave had confirmed it was not working. Not that it should be an issue until the fall/winter, but I would hate for someone to turn the heater on and forget about it. This could be a fire hazard. The heater is on or off, it does not regulate to a set temperature.

As for the blinds, it would be nice to figure that out at some point to match the other rooms that have been renovated and to give it a finished look.

I'll put up some painters tape for where the bulletin board goes this week.

Thanks

George Hargrave

I did not have any plans for heater or curtain replacement. Please put tape on the wall where you would like the bulletin board placed and a trustee will work on installing

Shawna Mercredi

Please let me know when someone is available to help move the copier into the resource room.

I'm at the church every day this week.

Shawna Mercredi

Hi George, I looked at the copier and the network cable for the copier is plugged into an Orbi Box, and the Orbi box is plugged into a regular power outlet. The copier is the only thing plugged into that box, so the Orbi box should be able to be moved into the resource room with the copier. David or Paix, please verify.

George Hargrave

Hi Shawna. I'm thinking this will need more review. What about printing from Barbie or Paix or Pastor. Are you award if a rthernwt plug is there for network connections? David Allison and Paix as digital trustees can you review moving the copier and any required hookups?

Shawna Mercredi

Hello, I am at the point in the resource room remodel to move the copier out of Barbi's office into the resource room. I could use some assistance with this.

Because I know where it goes and what I need to prepare for it as it is being moved, I do need to be present when it is being moved. Please let me know when someone has time to help with this. I am at the church most mornings, but I can come other times too. The only day I am not available is tomorrow.

Comments